Heavy Lift/Haulage |
 |
Off
loading of storage tank
N2 storage tank, 65 tons weight was offloaded from
Multi-Axles trailer by 250 tons and 120 tons cranes, prepare for
erection to foundation. |
| |
|
 |
Chimney installation
Works include removal of old chimney unit, fabrication of
new chimney and erection.
Size:
2.1m (Diameter) x 33m (Length) material stainless steel. |
| |
|
 |
Installation of turbine and generator at Sabah Forest, Sipitang
Jack down 180 ton generator from cometto and skid and
orientate onto foundation including levelling and alignment
works. |
| |
|
 |
Coldbox installation
INstallation of cold box at Ceylon Oxygen, Sri Lanka for NOL -
Singapore. |
|
|
|
|